气体增压设备与气液增压设备的操作区别在哪?

发布时间:2019-01-31 16:49:32   发布人:http://www.sdjingtuo.com
气体增压设备:
Gas Supercharging Equipment:
面板配置:三块表:驱动气压压力表,被增压气体压力表,高压气体压力表等
Panel configuration: three meters: driving pressure gauge, pressurized gas gauge, high pressure gas gauge, etc.
阀门:驱动气压调压阀,驱动气源开关,高压气体开关,和卸荷阀等
Valves: driving pneumatic pressure regulating valve, driving gas source switch, high pressure gas switch, and unloading valve, etc.
操作步骤:(针对打压容器较大的)
Operating steps: (for large pressure vessel)
预充气压阶段:关闭卸荷开关连接驱动气源管路打开驱动气体开关打开高压气体开关即可(将比较大的容器预充与空压机气压平衡的压力,以便缩短打压时间,延长增压机使用寿命)
Pre-charging stage: close unloading switch, connect driving gas source pipeline, open driving gas switch and open high-voltage gas switch. (Pre-charging larger container with pressure balanced with air compressor, in order to shorten the pressing time and prolong the service life of supercharger)
打压阶段:关闭卸荷开关关闭高压气体开关连接驱动气源管路打开驱动气压开关调节驱动气压压力表(稍微向上拔起,按“+“-”方向调节压力大小固定驱动气压压力值(轻微向下按下,固定驱动气压压力值)打开高压气体开关增压机工作达到设定压力关闭高压气体开关保压打开卸荷开关完成操作。
Pushing stage: close unloading switch, close high-pressure gas switch, connect driving gas source pipeline, open driving gas pressure switch, adjust driving pressure gauge (slightly pull up, adjust pressure in the direction of'+'-') Fixed driving pressure value (slightly press down, fixed driving pressure value) Open high-pressure gas switch booster to achieve set pressure, close high-pressure gas. The body switch keeps the voltage and opens the unloading switch to complete the operation.
气体增压泵
气液增压设备操作步骤:
Operating steps of gas-liquid supercharging equipment:
面板配置:
Panel configuration:
事先注满水:针对检测件较大的情况,建议事先将被测试件注满水,以便缩短增压机打压时间,延长使用寿命
Pre-filling water: In view of the larger test pieces, it is suggested that the test pieces be pre-filled with water in order to shorten the pressurizing time of the supercharger and prolong its service life.
连接被测试件关闭卸荷阀关闭高压液体开关连接驱动气源管路打开驱动气源开关调节驱动气源压力表(轻微向上拔下,按照“+”“-”方向调整压力大小>固定驱动气源压力值(轻微向下按下)打开高压液体开关增压机工作达到设定压力增压机停止工作保压关闭高压液体开关即可保压结束打开卸荷开关检测完成
Connect the test piece to close the unloading valve, close the high-pressure liquid switch, connect the drive gas source pipeline, open the drive gas source switch, adjust the pressure of the drive gas source pressure gauge (slightly pull up, adjust the pressure according to the direction of +"-">fix the pressure value of the drive gas source (slightly press down). Open the high-pressure liquid switch supercharger to set the pressure supercharger to stop working and keep the pressure closed. The liquid switch can hold the voltage and finish the detection of the unloading switch.